FPL LLCS-2 in plain language

LLCS-2, also effective January 1, 2026, says it is available in areas not served under LLCS-1. It uses the same application tests: projected new or incremental load of at least 50 MW at a single location and a projected load factor of at least 85 percent, with the company determining that load factor. It also says service is limited to the company's available capacity based on the estimated in-service date. Grid Accord does not know that capacity and will not infer a territory from a county or a line. Sheet 8.953

The printed LLCS-2 base charge is $669 and the base demand charge is $4.08 per kW. The base energy charge matches LLCS-1 at 0.758¢ per kWh. The incremental generation charge is a formula built from the customer's share of generation and transmission-interconnection revenue requirements, not the $11.67 figure printed on LLCS-1. The term, two-year notice, 70 percent demand floor, 11-month consideration, and 30-minute demand definition follow the same pattern as LLCS-1. Sheets 8.953 through 8.956

Related: large-load hub, glossary, source register, try a screen.