FPL LLCS-1 in plain language

Large-Load Contract Service-1 is a Florida Power & Light rate schedule printed effective January 1, 2026. It is available only in certain zones near Sunbreak in St. Lucie County, Tesoro in Martin County, and Sugar in Palm Beach County. Those names are not the whole county. A Palm Beach address does not, by itself, put a project on LLCS-1. FPL tariff Section 8, Sheet 8.950

The sheet's application language is for projected new or incremental load of at least 50 MW at a single location, with a projected load factor of at least 85 percent. The same sheet says the company determines that projected load factor. Grid Accord can compare a stated number with 50 and 85. It cannot replace the company's determination or certify that a customer qualifies. Sheet 8.950, Application

The sheet also describes a combined class cap of 3 GW and says the schedule closes to new or incremental load when that cap is fully subscribed. Three gigawatts is a class limit on the schedule. It is not a count of spare megawatts, and it is not a promise that any particular site can be served. Sheet 8.950, class cap

Printed LLCS-1 components on that sheet include a $669 base charge, a $14.61 per kW base demand charge, a 0.758¢ per kWh base energy charge, and an $11.67 per kW incremental generation charge. The sheet says those rates can change in a later rate proceeding. This site does not multiply them into a bill. Order No. PSC-2026-0022-S-EI also records the LLCS-1 incremental generation charge in the settlement as $11.67 per kW. Sheet 8.950, Monthly Rate Order No. PSC-2026-0022-S-EI

Term, floor, and demand interval

The schedule describes a minimum term of not less than 20 years from the in-service date, including the ramp, and customer notice at least two years before termination. During the ramp, the minimum bill language uses a demand component of no less than 70 percent of load-ramp demand, plus incremental generation charge on that ramp demand. After the ramp, the demand component uses the greater of 70 percent of contract demand or the highest billing demand in the past 11 months, and incremental generation charge on contract demand. Billing demand itself is the 30-minute period of greatest use, adjusted for power factor. Sheets 8.951 and 8.952