statute · billing-demand

Section 366.043 looks at the highest average load over a 15-minute interval. The LLCS sheets look at the 30-minute period of greatest use when they define billing demand. Both can be true. They are not the same measurement. Our reading of the tariff is that a stated load factor under 85 percent leaves the statutory 15-minute peak test open. The sheets state the 85 percent figure as an application test for the schedule.

If a request only states a 30-minute number, the 15-minute comparison should stay unrun. Guessing the other interval is how a notebook starts inventing precision.